Clinton Lofts; 30 units in pre-construction, 1 BR and 2 BR units will be built during 2023.
30 units are being built in Trenton NJ, walking distance from the train station and light rail stop. Ditch the car, Trenton is walkable.
Leasing expected Q4 2023.